Annexation Tracker

Annexation Name: Van Mall North
Affected County Road Projects | Report Date 07/31/2017
Project Name Project Number Project Description Project Limits Percent Affected
NE 88th Street 321022 Improve to 2-lane collector with center turn lane, bike lanes and sidewalks. NE St. Johns Road to NE Andresen Road 68.26 %
NE 63rd Street 330422 Improve to minor arterial with center turn lane/median, bike lanes and sidewalks. Install signal at NE 72nd Avenue. NE Andresen Road to Interstate 205 99.32 %
NE 63rd Street 900126 Improve to 2-lane collectorl with center left turn lane, bike lanes, and sidewalks. Interstate 205 to NE Covington Road 28.52 %
NE 72nd Avenue 901005 Improve to 2-lane collector standard. NE 65th Street to NE 78th Street 100.00 %
NE Padden Parkway 392722 Improve to 4-lane principal arterial parkway with a separated bicycle / pedestrian trail. Andresen Road to NE 94th Avenue 42.73 %
NE Andresen Road at NE 88th Street 900150 Reconstruct intersection. Intersection 100.00 %
NE 99th Street 900130 Construct a 2-lane minor arterial with a center turn lane/median, bike lanes and sidewalks. St. Johns Road to NE 72nd Avenue 69.84 %